The designs also contain a large battery at the internet site, to make sure extra electric power can be saved for the evening, plus a 220 kV transmission line which can connect the project into the North Star sub-station, in close proximity to in which a new 100 MW solar https://citypointsolar.com.au/6-6kw-solar-system/