Penmann recently finalised a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The scope included the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://thekiwisocial.com/story6195881/penmann-completes-major-hvac-upgrade-for-the-liverpool-based-nutricia-facility-to-align-with-the-fsi-development-programme