The final results present that if the stress stabilization time is two min, the coincidence degree with the indoor and area drilling fluid lost control effectiveness is the very best along with the evaluation result of the drilling fluid lost control efficiency is “very good. Exceeding fracture stress: Weak https://andrewo456kgc2.bloggadores.com/profile